RCRAIN CITY
PRODUCTION NOTES

Clear thinking for small productions.

About the publication ↗
On Set

Make a Rain Plan for a Seattle Commercial Shoot

Define the weather-sensitive shots, the decision time and the authorised alternative before the crew arrives on location.

A rain plan is a production decision, not a spare umbrella. It says which parts of the shoot can continue, which require a different setup and who decides when conditions no longer fit the plan. Begin with the shots that actually depend on the weather. A wet street may suit one concept, while a product demonstration, matching wardrobe or sensitive equipment may make the same conditions unsuitable for another.

List the weather-dependent elements beside each setup: light, wind, precipitation, ground condition and participant comfort. Keep safety decisions with the responsible production personnel and follow equipment limits. Do not reduce the assessment to whether the camera is covered. Stands, electrical equipment, walking surfaces, transport and the people waiting between takes all need to be considered by those qualified to manage the work.

Use a forecast for a specific place and time

The National Weather Service Seattle/Tacoma office provides local forecasts, radar, current hazards and forecast discussion. Use current information for the actual location rather than a broad seasonal assumption about Seattle. Record when the team will check it again. A forecast is information for a decision; it is not a guarantee that a brief clear period will arrive exactly when the shot list expects it.

Choose a decision time that allows people to act. A change made before travel may be manageable; the same change after a crew has unloaded can create a different cost and schedule. Agree who receives the decision and how they acknowledge it. Keep one current plan available to everyone. A revised call sheet does little good if half the team is still travelling to the location named in an older message.

Prepare a real alternative

Identify an interior or covered option that supports the message of the video and can legally and practically host the work. Check access, permission, sound and equipment footprint in advance. The Seattle Film Manual can help direct location and permit questions, but the alternate activity still needs its own relevant confirmation. A nearby awning is not automatically a production base or an authorised filming area.

If the exterior is essential, discuss a hold date or rescheduling terms with the people and suppliers involved. Keep those terms explicit in the production arrangements. Do not promise a free weather change without checking the actual agreements. If no second date is available, revise the concept early enough to make the limitation manageable. An honest indoor version may serve the project better than a rushed exterior assembled under unsuitable conditions.

Think about continuity

Rain changes surfaces, clothes, hair and reflections. If a sequence must appear continuous, note how those changes affect the edit. Photograph relevant continuity details and keep the shot order flexible where possible. A close-up recorded dry may not match a wide shot recorded later in heavy rain. Decide whether the change can be part of the visual approach or whether the sequence needs to be captured under more consistent conditions.

Plan dry storage, suitable breaks and the handling of wet items with the responsible departments. Allow time for safe transitions rather than expecting the crew to move at the same speed in every condition. Keep access routes clear and reassess them as conditions change. Production pressure does not make an improvised electrical or rigging solution acceptable. If qualified personnel stop a setup, the schedule needs to follow that decision.

After the shoot, record which contingency worked and what information was missing. Did the alternate room fit the crew, did the decision reach everyone, and were the essential shots still covered? Keep those notes with the production file. The next rain plan can then be based on a tested communication process, while the weather assessment itself remains specific to the next day and location.